Consultancy Services for Environmental Impact Assessment and Traffic Impact Assessment study for construction of the new proposed building for Karachi Club on Dr. Ziauddin Ahmed Road in Saddar Town.

021-34177576


• Inception Report
• Data collection and analysis of budget and historic & current tariff structures of municipalities
• Conduct trend analysis in revenue collections
• SWOT analysis
• Development of recommendations for improved financial sustainability of local governments.
AMOUNT Rs. (M) : 35.0
Completion: October 2017
• Inception Report
• Review of the Hospital Waste Management Plan for entire Lahore
• Recommend the most suitable approach for dealing with 100% of the hospital waste generated in Lahore.
• Development of the governance model/framework for defining the roles and responsibilities of various stakeholders.
• Development of implementation framework.
• Development of bidding documents for outsourcing of the operations.
AMOUNT Rs. (M) : 820.0
Completion: May to Oct 2017
• Review of the Scope of Work and Technical Specifications of the Outsourcing of SWM Services in Five Cities of Punjab.
• Provide opinion, recommendations, and observation through reviewing the Technical Specification Document for Five (5) cities.
Completion: Dec to March 2017
• Preliminary assessment of Waste Management of City Karachi is being carried out through Data Collection & Desk Review and is being compiled in a report. The report also contains the way forward and proposed Term of Reference with methodology to be performed by the consultants to develop the basis for planning an efficient ISWMB for the City of Karachi.
AMOUNT Rs. (M) : 0.5
Completion: May to June 2015
• Preparation of Environmental Management Plan for Chemical Industry.
• Submission of report to Sindh Environmental Protection Agency (SEPA).
• This Environmental Management plan provides a baseline to develop procedures, plans and to ensure that the mitigation measures and monitoring requirements are consistent with the Pakistan Environmental Protection Act.
AMOUNT Rs. (M) : 1.0
Completion: MARCH-2012
• Preparation of Half Yearly Environmental Audit Report of BYCO Oil Refinery (2010)
• Preparation of Half Yearly Environmental Audit Report of BYCO Oil Refinery (2011)
• Preparation of Half Yearly Environmental Audit Report of BYCO Oil Refinery (2012)
• Preparation of Half Yearly Environmental Audit Report of BYCO Oil Refinery (2013) and (2014)
AMOUNT Rs. (M) : 2.5
Completion: June to Dec 2014
• Engaged as Environmental Specialist
• Preparation of initial Environmental Screening and Environmental Strategic Plan to be followed for the Planning, Designing and Execution of the scheme.
AMOUNT Rs. (M) : 0.5
Completion: 2013
• Provide coordination for institutional arrangement for the establishment of Water and Sanitation Corporation in Sindh
• Provide Environmental Coordination for the entire project
• Review& Finalized EPA for the EIA NOC for the following projects
— Up-gradation and Rehabilitation of Bunder Road Water Supply Scheme, Sukkur
— Up-gradation and Rehabilitation of Khaki Shah Water Supply Scheme, Khairpur
— Up-gradation and Rehabilitation of Numaish Gah Water Supply Scheme, Sukkur
— Other Subprojects (a brief report is attached)
AMOUNT Rs. (M) : 5.0
Completion: Dec 2009 to Nov 2012